Source
Collaboration depth — found from sitemap — InLoox
Checked for InLoox on 1 Oct 2026
- Page
- https://docs.inloox.com/tasks/project-tasks/collaborators/
- Checked
- 1 Oct 2026, 15:47 UTC
- How we may use it
- Public page, crawling permitted
Technical details
- type
- page
- http status
- 200
- content hash
- sha256:d81425d6bbb56316658b461c8a8026d7774c2f8b4b8a0f6825e0938e72e8dbcd
- permission
- robots_ok
- screenshot
- Screenshot on file (internal exhibit, not published)
Cited by
Facts read from this source
-
Task collaborators Report an error
“you can add additional people as collaborators (contributors) to a task and assign them individual efforts. The assigned resource is still responsible for completing the task, but the collaborators also contribute effort that is included in the effort calculation.”
-
Collaborator effort autosum Report an error
“InLoox adds up the individual effort of the resource and each collaborator and automatically adds it to the total effort for the task.”
-
Collaborator total effort locked Report an error
“Once you add collaborators with individual efforts to a task, the total effort field is locked for editing. The total effort of a task can no longer be changed manually, but will be automatically updated when collaborators are added, their efforts change, or collaborators are removed from the task.”
-
Collaborator access warning Report an error
“If a collaborator you add does not have access to the project and will therefore not be able to see the task, InLoox displays a warning banner directly in the task. Make sure all collaborators are project members with the appropriate permissions.”
-
Collaborator task list column Report an error
“In the task list, you can add the Collaborator column to see at a glance which tasks you are contributing to. Tasks where you are a collaborator are marked with a checkmark in this column.”
-
Collaborator workplace visibility Report an error
“Tasks where you are listed as a collaborator now automatically appear in your Workplace under My Tasks and in the global task list.”
-
Collaborator permission required Report an error
“You need at least the Read tasks permission to use this feature. See Permissions for details.”
-
Effort unit follows task Report an error
“Please note that the value of the effort is determined by the value of the Effort field of the task. Change it there e.g. to Effort (hours), and the effort for collaborators will change, too.”