Source
Reporting — found from sitemap — Jira
Checked for Jira on 5 Oct 2026
- Page
- https://support.atlassian.com/analytics/docs/sprint-overview-dashboard-template/
- Checked
- 5 Oct 2026, 03:43 UTC
- How we may use it
- Public page, crawling permitted
Technical details
- type
- page
- http status
- 200
- content hash
- sha256:146df16b9dc1260b1a1543cc9ec68e86b3b7126ec71f9b958dc3beed48ce89fa
- permission
- robots_ok
- screenshot
- Screenshot on file (internal exhibit, not published)
Cited by
Facts read from this source
-
Sprint overview template Report an error
“This dashboard gives an overview of Jira sprints including work items completed, work items remaining, changes in sprint scope, work item status transitions, and work items per assignee.”
-
Metric view type filter Report an error
“Work items completed, work items remaining, scope change, and work item status and assignee charts can display either the count of work items or the sum of story points based on the View type filter selection.”
-
Done status definition Report an error
“A work item is considered completed when it transitions to any one of the statuses selected in the Done statuses filter. If no selection is made in this filter, then a work item is considered completed if it transitions to any status in the Done status category.”
-
Dashboard filters Report an error
“The entire dashboard can be filtered by the site URL of the Jira instance, sprint name, Done statuses, view type (work item count or story points), and work type.”
-
Sprint status values Report an error
“This section displays the current status of the sprint, which can be either closed, active, or future”
-
Status transitions heatmap Report an error
“This heatmap displays the count of transitions from one status to another during the sprint.”
-
Work item details table Report an error
“This table displays details of the remaining work items in the sprint. By default, the rows are sorted in descending order of work item age.”
-
Sprint actions table Report an error
“This table displays detailed data for sprint actions (work items added or removed from a sprint) and work item status transitions. It includes events that happened both during and prior to the start of the sprint.”
-
Cumulative completed remaining chart Report an error
“The chart shows the cumulative total of completed work items and remaining work items at the end of the day, as shown on the x-axis. If a work item had multiple status transitions during a particular day, then the last status is considered for the calculations.”
2 facts read from this page are not shown because they could not be confirmed on the page as captured.