Source
Reporting — found from sitemap — Taskworld
Checked for Taskworld on 13 Oct 2026
- Page
- https://help.taskworld.com/en/articles/5615738-reviewing-downloading-your-workload-report
- Checked
- 13 Oct 2026, 14:10 UTC
- How we may use it
- Public page, crawling permitted
Technical details
- type
- page
- http status
- 200
- content hash
- sha256:def647c05fab59354bf8da9b0629a7ec952bbb67a558eb67e8a0f74b9cfccc07
- permission
- robots_ok
- screenshot
- Screenshot on file (internal exhibit, not published)
Cited by
Facts read from this source
-
Workload report Report an error
“This report lets you see your personal workload across all projects in a daily, weekly, or monthly timeline format based on the number of assigned tasks or task points.”
-
Workload calculation options Report an error
“You can choose whether the workload should be calculated based on the number of assigned tasks or task points.”
-
Workload points splitting Report an error
“Should a task be scheduled for more than a day and/or has more than one assignee, the points will be equally divided by days and assignees.”
-
Workload overload indicator Report an error
“The blue bubble that indicates the assigned tasks or points will turn red once you exceed the maximum tasks or points for the set time period (day, week or month).”
-
Workload report project selection Report an error
“You will see a pre-selected list of projects you are part of. You can add or remove projects from this list (if needed) and decide whether you want to take unassigned tasks into account.”
-
Workload CSV export Report an error
“How to export to CSV.”
-
Workload inline task editing Report an error
“While you can make changes to tasks right from the workload view, the report will still reflect the state of the projects at the time the report was generated.”
-
Workload view switching Report an error
“By default, the view is set to daily. Click on the “daily” button to switch the view to weekly or monthly.”
-
Workload capacity settings Report an error
“Adjusting capacity means to select whether you want the workload to be calculated by task count or task points, and choose the maximum of tasks/points someone can be assigned to per day (or week/month depending on your view settings).”
2 facts read from this page are not shown because they could not be confirmed on the page as captured.
Scores citing this record
- The Bootstrapper Collaboration depth
- The Bootstrapper Reporting
- The Data Protection Officer Collaboration depth
- The Data Protection Officer Reporting
- The Enterprise Architect Collaboration depth
- The Enterprise Architect Reporting
- The Integrator Collaboration depth
- The Integrator Reporting
- The Skeptic Collaboration depth
- The Skeptic Reporting
- The UX Purist Collaboration depth
- The UX Purist Reporting