Roster building & demand planning
How this is scored
How a plan gets built across locations, roles and qualifications — templates, staffing requirements, forecasting from sales or occupancy, and whether the product proposes a roster or only draws one.
0 — Not a rostering tool; shifts cannot be planned in the product (a time clock, HR file or messenger only).
3 — A weekly shift grid per location with shift templates and roles attached, and the roster published to staff.
5 — Shift templates with roles or qualifications on shifts, several locations or departments, and open shifts or coverage gaps shown while planning.
8 — Staffing requirements per shift and demand-based planning from a named data source (POS revenue, footfall, occupancy or bookings), automatic roster proposals the planner can accept or adjust, labour cost shown against budget while planning, and cross-location staff sharing.
10 — Planning closes the loop: forecast, proposed roster and actual hours compared in one place, the proposal explains which rule or demand figure drove each assignment, and the vendor documents the forecasting method rather than calling it AI.
The Operations Director
Smart Planner is unusually well documented as a method — constraints on availability, daily span and weekly rest days, priority rules such as lowest hourly rate and lowest hour balance for equal skills, position assignment from schedule history, with rules defaulted from the collective agreement — and staffing forecasts plus automatic schedule creation are listed for the top tier alongside a till connection in the activity module. We found no public information showing the forecasts draw on the till data, on labour cost against budget while the plan is still editable, or on staff shared across sites, which is the loop I run thirty locations on. 2 6 2