Source
Absence & shift planning — found from sitemap — ZEP
Checked for ZEP on 16 Nov 2026
- Page
- https://support.zep.de/en/articles/682542-create-and-manage-scheduling
- Checked
- 16 Nov 2026, 21:02 UTC
- How we may use it
- Public page, crawling permitted
Technical details
- type
- page
- http status
- 200
- content hash
- sha256:5976362422e95cceb05c6441ee6c97e5ca9aff3295c8ef5a4cba381f2231c57f
- permission
- robots_ok
- screenshot
- Screenshot on file (internal exhibit, not published)
Cited by
Facts read from this source
-
Scheduling two levels Report an error
“Scheduling in Resource Planning works in two consecutive levels: First, you set a standard scheduling per employee and project as a percentage of the regular working time. Then you can override this default day by day in the specific scheduling”
-
Standard scheduling definition Report an error
“The standard scheduling indicates as a percentage of the regular working time the extent to which an employee is available for a project across the entire assignment period”
-
Standard scheduling auto daily hours Report an error
“ZEP converts this value into daily hours automatically for each working day of the assignment period”
-
Standard scheduling no version history Report an error
“ZEP does not keep version history for the standard scheduling — the new value applies retroactively to the entire assignment period.”
-
Multiple assignment periods Report an error
“you can store several consecutive assignment periods for the same employee, each with its own standard scheduling”
-
Specific scheduling time slots Report an error
“up to five From – To time slots”
-
Specific scheduling calendar Report an error
“Schedulings with a time of day additionally appear in the employee's calendar.”
-
Specific scheduling matrix Report an error
“It is always a matrix entry: ZEP shows a two-dimensional table with days as columns and projects or persons as rows.”
-
Scheduling inline entry Report an error
“you can also type hours or percentage values directly into the cell without opening the dialog. A number is read as hours. For a percentage, append a % sign”
-
Scheduling multi day selection Report an error
“By holding down the mouse button, you additionally select multiple days in one row or multiple rows at once. The typed value is then applied to the entire selection.”
-
Scheduling keyboard shortcuts Report an error
“Ctrl + B or Ctrl + E: opens the Edit planning dialog for the currently selected cell.”
-
Scheduling visual indicators Report an error
“Pink background: changed cells that have not yet been saved via Apply. Red exclamation mark in the day row: the day sum exceeds the employee's available hours — overload warning.”
-
Scheduling non working days setting Report an error
“These cells can still be scheduled if needed (see basic setting Scheduling also on non-working days).”
-
Scheduling totals rows Report an error
“Sum scheduled — added-up specific scheduling across all projects (employee view) or all persons (project view) for this day. Total scheduled — standard and specific scheduling combined, set against the availability.”
-
Scheduling available row absences Report an error
“Available — the daily capacity available for entry. ZEP automatically subtracts absences and holidays here.”
-
Scheduling workload row Report an error
“Workload (work packages) — the daily workload generated by assigned work packages.”
-
Scheduling project plan figures Report an error
“Plan total — planned effort of the project. Open — planned remainder not yet covered by actual bookings. Actual to yesterday — project times already booked.”
-
Scheduling turnover column Report an error
“Turnover — the associated planned revenue, calculated from the scheduled hours multiplied by the hourly rate of the respective price group of the project-employee assignment.”
-
Scheduling turnover currency conversion Report an error
“In the employee view, ZEP automatically converts the amounts from all projects into the base currency of your tenant”
-
Scheduling turnover requires module Report an error
“The sales-volume column only appears when the Revenue & Costs module is active and a base currency has been configured for your tenant.”
-
Scheduling turnover permission Report an error
“In the project view, the column is additionally only shown if the project is not internal and you have the Evaluate project sales volume right for this project”
-
Scheduling ratable distribution Report an error
“use the Ratable distribution function in the scheduling matrix. In the dialog, choose the employee or project, the unit (hours or days), the mode (Replace overwrites existing schedulings, Add supplements them), and the period from – to.”
-
Scheduling absence cleanup link Report an error
“ZEP does not automatically delete existing specific schedulings when an absence is recorded for the same day. Instead, a blue notice block "Delete scheduling on absence days" appears”
-
Scheduling assignment period cleanup Report an error
“ZEP shows a second blue notice block "Delete scheduling outside of assignment periods" in the same places as the absence box.”
-
Scheduling specific in calendar Report an error
“Specific schedulings appear automatically in the employee's calendar — standard schedulings do not.”
1 fact read from this page is not shown because it could not be confirmed on the page as captured.
Scores citing this record
- The Agency Owner Absence & shift planning
- The Agency Owner Project, cost-centre & billing
- The Agency Owner Absence & shift planning
- The Agency Owner Project, cost-centre & billing
- The Field Supervisor Absence & shift planning
- The Field Supervisor Project, cost-centre & billing
- The Field Supervisor Absence & shift planning
- The Field Supervisor Project, cost-centre & billing
- The Field Supervisor Absence & shift planning
- The Field Supervisor Project, cost-centre & billing
- The Operations Lead Absence & shift planning
- The Operations Lead Absence & shift planning
- The Operations Lead Project, cost-centre & billing
- The Payroll Officer Working-time law & audit record
- The Payroll Officer Absence & shift planning
- The Payroll Officer Project, cost-centre & billing
- The Payroll Officer Absence & shift planning
- The Payroll Officer Absence & shift planning
- The Skeptic Absence & shift planning
- The Skeptic Project, cost-centre & billing
- The Skeptic Absence & shift planning
- The Skeptic Project, cost-centre & billing
- The Skeptic Absence & shift planning
- The Skeptic Project, cost-centre & billing
- The Works Council Advocate Absence & shift planning
- The Works Council Advocate Project, cost-centre & billing
- The Works Council Advocate Absence & shift planning
- The Works Council Advocate Project, cost-centre & billing
- The Works Council Advocate Absence & shift planning
- The Works Council Advocate Project, cost-centre & billing