Roster building & demand planning
How this is scored
How a plan gets built across locations, roles and qualifications — templates, staffing requirements, forecasting from sales or occupancy, and whether the product proposes a roster or only draws one.
0 — Not a rostering tool; shifts cannot be planned in the product (a time clock, HR file or messenger only).
3 — A weekly shift grid per location with shift templates and roles attached, and the roster published to staff.
5 — Shift templates with roles or qualifications on shifts, several locations or departments, and open shifts or coverage gaps shown while planning.
8 — Staffing requirements per shift and demand-based planning from a named data source (POS revenue, footfall, occupancy or bookings), automatic roster proposals the planner can accept or adjust, labour cost shown against budget while planning, and cross-location staff sharing.
10 — Planning closes the loop: forecast, proposed roster and actual hours compared in one place, the proposal explains which rule or demand figure drove each assignment, and the vendor documents the forecasting method rather than calling it AI.
The Shift Manager
Saving a week as a template and re-importing it into any schedule, work areas and a qualifications filter so the untrained hand never lands on the till, several locations under one account with an all-locations view, and open shifts with yellow and blue coverage signalling while planning — that is a Thursday night I can work with. We found no public information on planning from a demand source such as POS revenue, footfall or bookings, automatic roster proposals, or labour cost against budget while planning. 6 1 5 2 9