whats-best.ai

Time Tracking & Attendance

GFOS

EU-Made Report an error

Panel rating · 6 judges · How to read the stars

Category median

Sovereignty: 1 of 4 dimensions proven

0–5 in half steps. 5 means the rubric's top anchor is met on the evidence.

by GFOS mbH · www.gfos.com

Compare with ATOSS → Report an error on this page Is this your product? →

Read this page as one judge. Each weighs the same scores by what they care about.

The Field Supervisor

Weighted verdict

Supervises crews on sites with no reliable signal and no desks. Judges everything by whether it works in a basement at 6am: offline capture, a shared terminal, corrections a foreman can make without a support ticket. A cloud-only app is a tool that will be filled in from memory on Friday.

Same scores as the panel view — this lens weights them the way this judge cares.

Scored by The Field Supervisor

Capture in the real workplace

How this is scored

How time actually gets recorded across the workforces a buyer has — desk staff, field and site crews, shift and deskless workers — and what happens when the network is not there.

0 — One browser timer and nothing else; anyone away from a desk records nothing.

3 — Web plus a mobile app, but no offline capture, no shared terminal, and corrections are an admin task rather than a workflow.

5 — Web, mobile and at least one shared capture point (kiosk, terminal or badge), with offline capture that syncs, and a correction workflow with approval.

8 — Several capture paths including hardware terminals or badge readers, reliable offline handling, GPS or geofenced check-in where the vendor states its limits, and bulk correction with an audit trail of who changed what.

10 — Capture fits the workforce rather than the reverse: desk, deskless, field and shift models all first-class, offline as a designed state rather than a failure mode, and every correction attributable, reasoned and reversible.

Report an error

The Field Supervisor

Offline is a designed state here, not a failure mode: bookings store locally when the server is unreachable and sync on return, any phone or tablet becomes a shared terminal with PIN or QR login for several workers on one device, and stationary terminals are named as the alternative, on top of iOS and Android apps with QR-code cost-centre switching. GPS capture is opt-in; I found no public information on its limits, and none on bulk corrections with an audit trail of who changed what. 4 5 8

Report an error

Working-time law & audit record

How this is scored

Whether the record satisfies the German recording duty (BAG 2022, § 3 ArbSchG) and the ArbZG rules around it — breaks, maximum hours, rest periods, retention — and whether it survives being inspected.

0 — Hours are summed and nothing else; no break handling, no limits, no retention statement.

3 — Break deduction exists but is a flat rule; no daily maximum or rest-period checks, and no stated retention period.

5 — Configurable break rules, warnings on the 8/10-hour daily maximum and the 11-hour rest period, and per-employee reports covering the recording duty.

8 — The ArbZG rules are modelled rather than approximated: break and rest enforcement with documented exceptions, overtime and time-account rules, the two-year retention handled by the system, and an export built for an inspection.

10 — The vendor treats the record as evidence: tamper-evident entries with full change history, retention and deletion executed per statute, documented handling of on-call, standby and travel time, and published guidance mapping features to the ArbZG sections they serve.

Report an error

The Field Supervisor

The engine for German working-time rules is visible — collective and works agreements and individual working-time models stored in wage type logic, flextime and vacation accounts, automatic overtime and premium valuation, and a healthcare page claiming compliance with working time regulations. But I found no public information on break rules, daily maximum or rest-period checks, retention of the time record for an inspection, or tamper-evidence on entries. 1 9 10

Report an error

Absence & shift planning

How this is scored

Vacation, sickness and the shift or duty roster — the half of attendance that decides whether the time data means anything.

0 — No absence handling; vacation lives in a separate calendar or spreadsheet.

3 — Vacation requests with approval, but entitlement is manual, carry-over is not handled and there is no rostering.

5 — Automatic entitlement and carry-over, sickness recording, an absence calendar, and basic shift planning with availability.

8 — Public-holiday calendars per location, pro-rata entitlement, substitution and swap workflows, shift templates with qualification and rest-period checks, and coverage warnings before publication.

10 — Planning and recording are one system: rosters that respect statutory rest and the works agreement, absence that reflows the plan automatically, and forecast-versus-actual reporting a team lead can act on.

Report an error

The Field Supervisor

Absence and roster are one connected system: leave via web or app with approval, sickness split into first notification, follow-up and work accident with certified eAU retrieval, entitlements monitored with remaining-leave capping, and a duty roster with a duty exchange platform, availability doodles, shift suggestions matched to qualifications and planning-conflict alerts that rework the plan when someone drops out. I found no public information on public-holiday calendars per location, pro-rata entitlement, or rest-period checks inside shift templates. 5 6 7

Report an error

Project, cost-centre & billing

How this is scored

Whether recorded time can carry the allocation an agency, workshop or professional-services firm needs — project, task, cost centre, billable status — through to an invoice or a client report.

0 — Attendance only; no project, task or cost-centre dimension at all.

3 — A free-text note or a single project field, with no rates, no billable flag and no per-project reporting.

5 — Projects and tasks with a billable flag and per-project reports, plus a rate per person or per project.

8 — Multi-level structure (client, project, task, cost centre), rate cards by person, role and project, budget tracking with warnings, and an invoice-ready export.

10 — Time becomes revenue without re-entry: approval before billing, rate rules that survive a rate change mid-project, client-facing reports, and a maintained handoff into named accounting or invoicing systems.

Report an error

The Field Supervisor

Recorded time carries a real allocation — projects, sub-projects, tasks, activities, locations and cost centres — with a billable flag, percentage auto-bookings to master projects, automatic deviation monitoring, target/actual project reports, and a transfer of evaluated times onward for invoicing. I found no public information on rates per person or per project, or on budget tracking with warnings. 8 10

Report an error

Payroll handoff

How this is scored

How the recorded month reaches payroll — DATEV, Lohn und Gehalt, an in-house system or the tax adviser — and how much of it is automated rather than retyped.

0 — No payroll path stated; the month leaves as a spreadsheet someone retypes.

3 — Generic CSV said to be usable for payroll, with no named system, no defined format and no handling of surcharges.

5 — A named payroll integration or a documented export format for at least one major system, covering hours, absences and overtime.

8 — Vendor-maintained integration with a named provider, covering night, Sunday and holiday surcharges, time accounts and mid-month changes, with a lock step before transmission.

10 — Payroll is designed for, not exported to: several named systems maintained, an auditable approval and lock, retro handling for corrections after the close, and the tax adviser given their own scoped access.

Report an error

The Field Supervisor

This is the deepest part of the offering: certified interfaces to DATEV, PAISY, SAP, LOGA and VEDA among 30-plus payroll interfaces plus a neutral record format for anything else, night, Sunday and holiday premiums and overtime pushed to wage types automatically from recorded times, flextime and vacation accounts in the data record, absence changes synchronized by cancellation or extension, retroactive accounting and test payrolls before the monthly button-press transfer. I found no public information on a lock or approval step before transmission, or on scoped access for the tax adviser. 7 9 10

Report an error

European sovereignty

How this is scored

Where the data lives, who the contracting entity is, who the subprocessors are, and whether that is documented rather than assumed. Independently sourced by the sovereignty pipeline; scored here as this buyer weighs it.

0 — Non-EU vendor and contracting entity, hosting region unstated or non-EU, subprocessors not named.

3 — EU hosting offered as an option, but the contracting entity is non-EU or the subprocessor list is absent.

5 — EU hosting as standard and an EU contracting entity, but the subprocessor chain includes non-EU providers without an explained safeguard.

8 — EU or DACH hosting with a named data-centre provider, EU contracting entity, full subprocessor list published, and any non-EU processing named with its legal basis.

10 — Sovereign end to end and evidenced: vendor, entity, hosting and every subprocessor in the EU, data-centre certification published, and an on-premises or private-cloud option for buyers who need it.

Report an error

The Field Supervisor

The contracting party is German to the bone — GFOS mbH in Essen, Amtsgericht Essen register, German VAT number, a named data protection officer and an ISO 27001 certificate — and the privacy policy even names its website subprocessors, including HubSpot servers in Germany and the USA under an Art. 49 derogation. I found no public information on where customer time data is hosted or on subprocessors for the product itself, and that silence is what matters when crews' clockings leave the site. 2 3 1 4

Report an error

Pricing transparency not rated — the vendor publishes no price

How this is scored

Whether a buyer can compute the real annual invoice for their headcount — including terminals, modules and minimums — from public pages alone.

0 — No public prices at all; every tier is a sales conversation.

3 — A per-user headline exists, but hardware, modules or a minimum seat count are unpriced or unmentioned.

5 — Per-user prices public for the main tiers with the billing period stated, but at least one commonly needed piece (terminal hardware, planning module, payroll export) sits in an unpriced bundle.

8 — Every tier and module priced publicly with per-user maths, billing period, minimum term and VAT treatment stated; only genuinely custom work lacks a number.

10 — Complete price computability: a calculator or table producing the annual invoice for a given headcount and module selection, including hardware, setup and renewal terms.

Report an error

The Field Supervisor

The pages name tiers from Base to Enterprise and list modules, but we found no public prices for any tier, per-user seat, module or terminal hardware. The tier names are public; the numbers are a sales conversation. 1 7 9

Report an error

European sovereignty — proven facts

1 of 4 dimensions proven

Built only from facts shown on the vendor's own pages. A dimension we could not prove is left open, not scored as zero.

Ownership Not determined — uncited Report an error
Data residency Not determined — uncited Report an error
Subprocessors Not determined ⚠ unverified — uncited Report an error

Where this could be wrong

What we left out

A claim that does not survive our checks costs us the claim, not the page. This is what was taken off this one.

Sources (10)

The pages every claim on this page was read from — each one checked, dated, and kept verifiable.

  1. 1 Vendor homepage www.gfos.com Checked 17 Sep 2026 +1 earlier capture: 30 Aug 2026 Details →
  2. 2 Imprint www.gfos.com Checked 17 Sep 2026 Details →
  3. 3 Privacy policy www.gfos.com Checked 17 Sep 2026 Details →
  4. 4 Capture in the real workplace — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →
  5. 5 Capture in the real workplace — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →
  6. 6 Absence & shift planning — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →
  7. 7 Absence & shift planning — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →
  8. 8 Project, cost-centre & billing — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →
  9. 9 Payroll handoff — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →
  10. 10 Payroll handoff — found from sitemap www.gfos.com Checked 1 Oct 2026 Details →